WORK ORDER / FILE → PLATE → QUOTE
What's on
the workbench?
Start with the full sliced footprint. Then put a cost beside the result.
01 / PLATE CAPACITYFull layout tool ↗
Look inside the geometry.
Original enclosure. Assembled and exploded views. Wall, vent and fastener questions before slicing.
Open the study ↗03 / ESTIMATEPut the cost beside the part.
Compare material, machine time, handling and failed attempts for the same good quantity.
Compare two scenarios ↗04 / CHECKKnow what the quote can absorb.
Find where extra rejects consume the reserve you intended to keep.
Check the reserve ↗WORKED EXAMPLE / EDITABLE ASSUMPTIONS
Twelve parts.
Two ways to make them.
A shorter print is not automatically a cheaper batch. Scenario A uses less handling time; scenario B uses a different material and failure allowance. Compare both with your own slicer estimates.
Open the two-scenario calculator ↗- GOOD PARTS REQUIRED
- 12
- COMPARE
- Material + time + handling
- CHECK BEFORE QUOTING
- Failure allowance + usable yield
THE JOB RECORD / GUIDES & CASE NOTES
Keep the working.
| 01 / COSTING | The real cost of a print | Method + example |
|---|---|---|
| 02 / MATERIAL | Plan the spool before a long run | Measurements + uncertainty |
| 03 / PRODUCTION | Plan a repeatable batch | Plate count + yield |
| 04 / CASE NOTE | 25 good parts, three runs | Worked, untested assumptions |