Skip to content

WORKBENCH / METHODOLOGY

The cost of a retry.

At a 20% failure rate, ten good parts require an expected 12.5 attempts. This is a planning average. An actual run cannot contain half a print.

If each attempt uses 100 g at $20/kg, direct material comes to $25. At two hours, 100 W and $0.25 per kWh, power adds $0.63. Add $12.50 in machine time and $18.75 in labor: $56.88 total, or $5.69 per good part.

What the model assumes

Every failed job consumes the full attempt cost. Enter your own average values. Model early failures separately if you collect good data; taxes, packaging and shipping are excluded.

Try your own numbers →

Filament Workbench

Your privacy choices

With your permission, we use Google Analytics to understand page visits. Google Analytics stays unloaded without consent. Articles, calculators and 3D views work with either choice.

Optional analytics only

Advertising and personalisation stay off. We send the canonical page address without query strings or fragments, and no calculator entries. Your choice applies only to this site for up to 180 days.

Change your choice here anytime. Withdrawing consent reloads the page to unload Google code; save any open tool inputs first. Privacy and storage details